High-speed blower automatic production line XT-BL2940

High-speed blower automatic production line XT-BL2940

Equipment Overview

This line is used for automatic assembly of the blower motor. The line consists of stator tin dipping test sleeve

heat shrink tube equipment, blowing heat shrink tube and visual inspection equipment, stator wire coating UV glue

equipment, shell feeding machine, shell dispensing bearing equipment,shelldispensingstatorequipment, endcap

feeding machine, end cap dispensing bearing equipment, rotor end cap into the shell equipment, magnetizing

machine, dispensing impeller equipment, PCB board assembly equipment, dispensing pressure resistance test

equipment. The rotor is manually fed, the rest of the materials are automatically fed, the equipment is auto-

matically assembled and tested, and the defects are automatically discharged.

Assembly Process

1,Stator feeding & stator pin correction

2, Solder the stator pins

3, Stator performance test + bad discharge

3, Stator sleeve heat shrink tube

5, Blow heat shrink tube heat shrink + visual detection

6, The stator wire is coated with UV adhesive curing + visual detection

7, Housing bearing + dimensional inspection

8, Shell stator loci + visual detection + bad arrangement

9, The stator is installed in the housing

10, The rotor is installed in the housing

11, End cap pressing bearing + end cap into the housing

12, stand + magnetize

13, Pressure mounting impeller + dimensional detection

14, install PCB board + solder + visual inspection

15, UV gluing + curing + visual detection

16,Pressure test + laser marking + blanking

 

Features

UPH: 900 PCS

Power: 65KW

Yield: 98%

Utilization Rate: 95%

Equipment Dimensions: (L) 20,000 x (W) 1,500 x (H) 2,000mma